Country : Bulgaria Continent : Europe

Production capacities

       

End 2003 : 10 MW (+ %) End 2004 : 10 MW (+0 %) End 2005 : 14 MW (+40 %) End 2006 : 36 MW (+157.2 %) End 2007 : 57 MW (+58.4 %) End 2008 : 158 MW (+177.2 %) End 2009 : 177 MW (+12.1 %) End 2010 : 375 MW (+111.9 %)

Dobrich (Bulgaria)

Name Total power Number Models Installation (kW) of turbines Kardam Total 12600 12600 6 6 Suzlon S88/2100 2010/12 Remark : total sums don't take into account the unknown values.

Dobrudscha (Bulgaria)

Total power (kW) 35000 35000 Number of turbines 35 35 Mitsubishi MWT-1000-61 2008/07 Models Installation Name Kaliakra Wind Total Remark : total sums don't take into account the unknown values.

ND (Bulgaria)

Total power (kW) 300 300 500 400 725 150 700 250 500 250 1050 60000 975 1355 2000 Number of turbines 1 1 1 1 3 1 2 1 2 1 3 30 4 3 1 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND Models Installation Name Ajtos Ajtos Ajtos Ajtos E Ajtos N Ajtos N Ajtos SW Bacchik NE Bacchik NE Bacchik NE Dobric Sth Drandar Elhovo Sth Gulyantsi NE Gurkovo Kavarna Kavarna Kavarna Kavarna Kavarna Kavarna Kavarna E Kavarna E Kavarna E Kavarna N Kavarna N Kavarna N Kavarna NE Kavarna NE Kavarna NE Kavarna NE Kavarna NW Kavarna W Kavarna W Mogilishte Omurtag Ruse Sth Shabla NW Shabla NW Shabla SE Shabla SW Shabla SW Shabla SW Shabla West Sliven Sliven Sliven E Sliven E Sliven E Sliven N Sliven N Sliven N Sliven N Straldza Sth Targoviste 9000 1500 1000 500 10000 112000 500 600 3850 500 500 4000 1700 5100 750 950 156000 2700 11400 3000 750 95 490 1500 400 2500 2400 1200 1200 250 750 500 400 500 1200 1000 1000 3650 750 500 6 1 2 1 5 unav. 1 1 5 1 1 4 3 7 1 2 52 3 14 3 1 1 1 1 1 5 5 1 3 1 3 1 1 1 1 1 1 5 3 1 Leitwind LTW77-1500 Leitwind LTW80-1500 Vestas Leitwind LTW77-1000 2009 2009 ND ND ND ND ND ND ND ND ND ND ND ND ND ND 2009 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND Verbund Vetrocom Yambol Total 16000 50000 400 482440 unav. unav. 1 207 ND ND ND

Microsoft Office Word 2003.lnk

Ajtos (1100 kW, 3 turbines) Generalities

   

Wind farm name : Ajtos Country : Bulgaria

Total installed power : 1.1 MW

Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 300 kW Operational Operator : Proydev

Part #2 :

1 turbine(s) (manufacturer name not available) (turbine model not available)

  

Total power : 300 kW Operational

Operator : Marin Asamov

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : Divex

Ajtos E (400 kW, 1 turbine) Generalities

   

Wind farm name : Ajtos E Country : Bulgaria

Total installed power : 0.4 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational

Operator : ATM Mihalev

Ajtos N (875 kW, 4 turbines) Generalities

   

Wind farm name : Ajtos N Country : Bulgaria

Total installed power : 0.875 MW

Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 725 kW Operational

Operator : Elprom Energy

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 150 kW Operational Operator : Helios Milk

Ajtos SW (700 kW, 2 turbines) Generalities

   

Wind farm name : Ajtos SW Country : Bulgaria

Total installed power : 0.7 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 700 kW Operational

Operator : Galin Hristov

Bacchik NE (1000 kW, 4 turbines) Generalities

   

Wind farm name : Bacchik NE Country : Bulgaria

Total installed power : 1 MW

Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 250 kW Operational Operator : Mark 88

Part #2 :

   

2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational

Operator : 999 - Ivaylo Asenov

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 250 kW Operational

Operator : Altima Engineering

Dobric Sth (1050 kW, 3 turbines) Generalities

   

Wind farm name : Dobric Sth Country : Bulgaria

Total installed power : 1.05 MW

Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1050 kW Operational Operator : Ecoenergy

Drandar (60000 kW, 30 turbines) Generalities

   

Wind farm name : Drandar Country : Bulgaria

Total installed power : 60 MW

Yearly estimated production : 150 GW.h (for an equivalent of 2500 hours of full load / year)

Details

  

30 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 60000 kW Under construction

 Operator : Eolica Bilgaria

Elhovo Sth (975 kW, 4 turbines) Generalities

   

Wind farm name : Elhovo Sth Country : Bulgaria

Total installed power : 0.975 MW

Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

4 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 975 kW Operational

Operator : Vassil Valkov

Gulyantsi NE (1355 kW, 3 turbines) Generalities

   

Wind farm name : Gulyantsi NE Country : Bulgaria

Total installed power : 1.355 MW

Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1355 kW Operational Operator : Velga

Gurkovo (2000 kW, 1 turbine) Generalities

   

Wind farm name : Gurkovo Country : Bulgaria

Total installed power : 2 MW

Yearly estimated production : 5 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2000 kW Operational

Operator : K&S Energy 2

Kaliakra Wind (35000 kW, 35 turbines) Generalities

    

Wind farm name : Kaliakra Wind Country : Bulgaria

County / Zone : Dobrudscha Total installed power : 35 MW

Yearly estimated production : 87 GW.h (for an equivalent of 2500 hours of full load / year)

Details

      

Installation : 2008/07

35 turbine(s) Mitsubishi MWT-1000-61 (puissance de 1000 kW, diamètre de 61.4 m) Total power : 35000 kW Total wings surface : 102970 m² Operational

Developed by : Kaliakra Wind Power AD Operator : Kaliakra Wind Power AD

Kardam (12600 kW, 6 turbines) Generalities

    

Wind farm name : Kardam Country : Bulgaria County / Zone : Dobrich Total installed power : 12.6 MW

Yearly estimated production : 31 GW.h (for an equivalent of 2500 hours of full load / year)

Details

       

Installation : 2010/12

6 turbine(s) Suzlon S88/2100 (puissance de 2100 kW, diamètre de 88 m) Hub height : 79 m Total power : 12600 kW Total wings surface : 36492 m² Operational

Developed by : Energy Asset Managemt EOOD Propriétaire : Energy Asset Managemt EOOD

Kavarna (134000 kW, 15 turbines) Generalities

  

Wind farm name : Kavarna Country : Bulgaria

Total installed power : 134 MW

 Yearly estimated production : 335 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1000 kW Operational

Operator : Arko Import

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : VTK

Part #3 :

   

5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 10000 kW Operational Operator : Longman

Part #4 :

  

Turbine(s) (manufacturer name not available) (turbine model not available) Total power : 112000 kW Operational

Part #5 :

     

Installation : 2009

6 turbine(s) Leitwind LTW77-1500 (puissance de 1500 kW, diamètre de 76.8 m) Hub height : 80 m Total power : 9000 kW Total wings surface : 27792 m² Operational

Part #6 :

     

Installation : 2009

1 turbine(s) Leitwind LTW80-1500 (puissance de 1500 kW, diamètre de 80.3 m) Hub height : 80 m Total power : 1500 kW Total wings surface : 5064 m² Operational

Kavarna E (4950 kW, 7 turbines) Generalities

   

Wind farm name : Kavarna E Country : Bulgaria

Total installed power : 4.95 MW

Yearly estimated production : 12 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational

Operator : VEC Engineering

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 600 kW Operational

Operator : Vertikal Petrov & Co

Part #3 :

   

5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 3850 kW Operational Operator : Windex

Kavarna N (5000 kW, 6 turbines) Generalities

   

Wind farm name : Kavarna N Country : Bulgaria

Total installed power : 5 MW

Yearly estimated production : 12 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational

Operator : Nik Builing Prim

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : City-D

Part #3 :

   

4 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 4000 kW Operational

Operator : Eco Energy BG

Kavarna NE (8500 kW, 13 turbines) Generalities

   

Wind farm name : Kavarna NE Country : Bulgaria

Total installed power : 8.5 MW

Yearly estimated production : 21 GW.h (for an equivalent of 2500 hours of full load / year)

Details Part #1 :

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1700 kW Operational

Operator : Evklips - Nikolay Rashev

Part #2 :

   

7 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 5100 kW Operational Operator : Disib

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational

Operator : Millenium Group holding

Part #4 :

   

2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 950 kW Operational Operator : Degrets

Kavarna NW (156000 kW, 52 turbines) Generalities

   

Wind farm name : Kavarna NE Country : Bulgaria

Total installed power : 8.5 MW

Yearly estimated production : 21 GW.h (for an equivalent of 2500 hours of full load / year)

Details Part #1 :

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1700 kW Operational

Operator : Evklips - Nikolay Rashev

Part #2 :

   

7 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 5100 kW Operational Operator : Disib

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational

Operator : Millenium Group holding

Part #4 :

   

2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 950 kW Operational Operator : Degrets

Kavarna W (14100 kW, 17 turbines) Generalities

   

Wind farm name : Kavarna W Country : Bulgaria

Total installed power : 14.1 MW

Yearly estimated production : 35 GW.h (for an equivalent of 2500 hours of full load / year)

Details Part #1 :

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2700 kW Operational Operator : Argos

Part #2 :

   

14 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 11400 kW Operational Operator : Sinik

Mogilishte (3000 kW, 3 turbines) Generalities

   

Wind farm name : Mogilishte Country : Bulgaria

Total installed power : 3 MW

Yearly estimated production : 7 GW.h (for an equivalent of 2500 hours of full load / year)

Details

    

City : Mogilishte

3 turbine(s) Leitwind LTW77-1000 (puissance de 1000 kW, diamètre de 77 m) Total power : 3000 kW Total wings surface : 13971 m² Operational

Omurtag (750 kW, 1 turbine) Generalities

   

Wind farm name : Omurtag Country : Bulgaria

Total installed power : 0.75 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational Operator : City-D

Ruse Sth (95 kW, 1 turbine) Generalities

   

Wind farm name : Ruse Sth Country : Bulgaria

Total installed power : 0.095 MW

Yearly estimated production : 0 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 95 kW Operational Operator : Kapoli-ER

Shabla NW (1990 kW, 2 turbines) Generalities

   

Wind farm name : Shabla NW Country : Bulgaria

Total installed power : 1.99 MW

Yearly estimated production : 4 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 490 kW Operational Operator : Ecoenergy

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1500 kW Operational Operator : Windsys

Shabla SE (400 kW, 1 turbine) Generalities

 

Wind farm name : Shabla SE Country : Bulgaria

 

Total installed power : 0.4 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational Operator : KNPK

Shabla SW (6100 kW, 11 turbines) Generalities

   

Wind farm name : Shabla SW Country : Bulgaria

Total installed power : 6.1 MW

Yearly estimated production : 15 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2500 kW Operational

Operator : Wind Energie Varna

Part #2 :

   

5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2400 kW Operational

Operator : Energy Invest

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1200 kW Operational

Operator : Dynamic group

Shabla West (1200 kW, 3 turbines) Generalities

   

Wind farm name : Shabla West Country : Bulgaria

Total installed power : 1.2 MW

Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1200 kW Operational Operator : Whirlwind

Sliven (1000 kW, 4 turbines) Generalities

   

Wind farm name : Sliven Country : Bulgaria

Total installed power : 1 MW

Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 250 kW Operational

Operator : Energia Kavrakovi

Part #2 :

   

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational

Operator : ATM Bulgaria Ltd

Sliven E (1400 kW, 3 turbines) Generalities

   

Wind farm name : Sliven E Country : Bulgaria

Total installed power : 1.4 MW

Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : Windcom

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational

Operator : East-European energy systems

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational

Operator : Photocommerce

Sliven N (6850 kW, 8 turbines) Generalities

   

Wind farm name : Sliven N Country : Bulgaria

Total installed power : 6.85 MW

Yearly estimated production : 17 GW.h (for an equivalent of 2500 hours of full load / year)

Details

Part #1 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1200 kW Operational Operator : Nachev

Part #2 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1000 kW Operational

Operator : Rubikon Shipping

Part #3 :

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1000 kW Operational

Operator : Nachevi & Co

Part #4 :

   

5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 3650 kW Operational Operator : Yoana

Straldza Sth (750 kW, 3 turbines) Generalities

   

Wind farm name : Straldza Sth Country : Bulgaria

Total installed power : 0.75 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

  

3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational

Targoviste (500 kW, 1 turbine) Generalities

   

Wind farm name : Targoviste Country : Bulgaria

Total installed power : 0.5 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational

Operator : Vertikal Petrov & Co

Verbund (16000 kW) Generalities

   

Wind farm name : Verbund Country : Bulgaria

Total installed power : 16 MW

Yearly estimated production : 40 GW.h (for an equivalent of 2500 hours of full load / year)

Details

  

Turbine(s) (manufacturer name not available) (turbine model not available) Total power : 16000 kW Operational

Vetrocom (50000 kW) Generalities

   

Wind farm name : Vetrocom Country : Bulgaria

Total installed power : 50 MW

Yearly estimated production : 125 GW.h (for an equivalent of 2500 hours of full load / year)

Details

  

Turbine(s) (manufacturer name not available) (turbine model not available) Total power : 50000 kW Operational

Yambol (400 kW, 1 turbine) Generalities

   

Wind farm name : Yambol Country : Bulgaria

Total installed power : 0.4 MW

Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)

Details

   

1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational Operator : Popov

因篇幅问题不能全部显示,请点此查看更多更全内容

Copyright © 2019- haog.cn 版权所有

违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务