Country : Bulgaria Continent : Europe
Production capacities
End 2003 : 10 MW (+ %) End 2004 : 10 MW (+0 %) End 2005 : 14 MW (+40 %) End 2006 : 36 MW (+157.2 %) End 2007 : 57 MW (+58.4 %) End 2008 : 158 MW (+177.2 %) End 2009 : 177 MW (+12.1 %) End 2010 : 375 MW (+111.9 %)
Dobrich (Bulgaria)
Name Total power Number Models Installation (kW) of turbines Kardam Total 12600 12600 6 6 Suzlon S88/2100 2010/12 Remark : total sums don't take into account the unknown values.
Dobrudscha (Bulgaria)
Total power (kW) 35000 35000 Number of turbines 35 35 Mitsubishi MWT-1000-61 2008/07 Models Installation Name Kaliakra Wind Total Remark : total sums don't take into account the unknown values.
ND (Bulgaria)
Total power (kW) 300 300 500 400 725 150 700 250 500 250 1050 60000 975 1355 2000 Number of turbines 1 1 1 1 3 1 2 1 2 1 3 30 4 3 1 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND Models Installation Name Ajtos Ajtos Ajtos Ajtos E Ajtos N Ajtos N Ajtos SW Bacchik NE Bacchik NE Bacchik NE Dobric Sth Drandar Elhovo Sth Gulyantsi NE Gurkovo Kavarna Kavarna Kavarna Kavarna Kavarna Kavarna Kavarna E Kavarna E Kavarna E Kavarna N Kavarna N Kavarna N Kavarna NE Kavarna NE Kavarna NE Kavarna NE Kavarna NW Kavarna W Kavarna W Mogilishte Omurtag Ruse Sth Shabla NW Shabla NW Shabla SE Shabla SW Shabla SW Shabla SW Shabla West Sliven Sliven Sliven E Sliven E Sliven E Sliven N Sliven N Sliven N Sliven N Straldza Sth Targoviste 9000 1500 1000 500 10000 112000 500 600 3850 500 500 4000 1700 5100 750 950 156000 2700 11400 3000 750 95 490 1500 400 2500 2400 1200 1200 250 750 500 400 500 1200 1000 1000 3650 750 500 6 1 2 1 5 unav. 1 1 5 1 1 4 3 7 1 2 52 3 14 3 1 1 1 1 1 5 5 1 3 1 3 1 1 1 1 1 1 5 3 1 Leitwind LTW77-1500 Leitwind LTW80-1500 Vestas Leitwind LTW77-1000 2009 2009 ND ND ND ND ND ND ND ND ND ND ND ND ND ND 2009 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND Verbund Vetrocom Yambol Total 16000 50000 400 482440 unav. unav. 1 207 ND ND ND
Microsoft Office Word 2003.lnk
Ajtos (1100 kW, 3 turbines) Generalities
Wind farm name : Ajtos Country : Bulgaria
Total installed power : 1.1 MW
Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 300 kW Operational Operator : Proydev
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available)
Total power : 300 kW Operational
Operator : Marin Asamov
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : Divex
Ajtos E (400 kW, 1 turbine) Generalities
Wind farm name : Ajtos E Country : Bulgaria
Total installed power : 0.4 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational
Operator : ATM Mihalev
Ajtos N (875 kW, 4 turbines) Generalities
Wind farm name : Ajtos N Country : Bulgaria
Total installed power : 0.875 MW
Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 725 kW Operational
Operator : Elprom Energy
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 150 kW Operational Operator : Helios Milk
Ajtos SW (700 kW, 2 turbines) Generalities
Wind farm name : Ajtos SW Country : Bulgaria
Total installed power : 0.7 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 700 kW Operational
Operator : Galin Hristov
Bacchik NE (1000 kW, 4 turbines) Generalities
Wind farm name : Bacchik NE Country : Bulgaria
Total installed power : 1 MW
Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 250 kW Operational Operator : Mark 88
Part #2 :
2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational
Operator : 999 - Ivaylo Asenov
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 250 kW Operational
Operator : Altima Engineering
Dobric Sth (1050 kW, 3 turbines) Generalities
Wind farm name : Dobric Sth Country : Bulgaria
Total installed power : 1.05 MW
Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)
Details
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1050 kW Operational Operator : Ecoenergy
Drandar (60000 kW, 30 turbines) Generalities
Wind farm name : Drandar Country : Bulgaria
Total installed power : 60 MW
Yearly estimated production : 150 GW.h (for an equivalent of 2500 hours of full load / year)
Details
30 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 60000 kW Under construction
Operator : Eolica Bilgaria
Elhovo Sth (975 kW, 4 turbines) Generalities
Wind farm name : Elhovo Sth Country : Bulgaria
Total installed power : 0.975 MW
Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)
Details
4 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 975 kW Operational
Operator : Vassil Valkov
Gulyantsi NE (1355 kW, 3 turbines) Generalities
Wind farm name : Gulyantsi NE Country : Bulgaria
Total installed power : 1.355 MW
Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)
Details
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1355 kW Operational Operator : Velga
Gurkovo (2000 kW, 1 turbine) Generalities
Wind farm name : Gurkovo Country : Bulgaria
Total installed power : 2 MW
Yearly estimated production : 5 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2000 kW Operational
Operator : K&S Energy 2
Kaliakra Wind (35000 kW, 35 turbines) Generalities
Wind farm name : Kaliakra Wind Country : Bulgaria
County / Zone : Dobrudscha Total installed power : 35 MW
Yearly estimated production : 87 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Installation : 2008/07
35 turbine(s) Mitsubishi MWT-1000-61 (puissance de 1000 kW, diamètre de 61.4 m) Total power : 35000 kW Total wings surface : 102970 m² Operational
Developed by : Kaliakra Wind Power AD Operator : Kaliakra Wind Power AD
Kardam (12600 kW, 6 turbines) Generalities
Wind farm name : Kardam Country : Bulgaria County / Zone : Dobrich Total installed power : 12.6 MW
Yearly estimated production : 31 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Installation : 2010/12
6 turbine(s) Suzlon S88/2100 (puissance de 2100 kW, diamètre de 88 m) Hub height : 79 m Total power : 12600 kW Total wings surface : 36492 m² Operational
Developed by : Energy Asset Managemt EOOD Propriétaire : Energy Asset Managemt EOOD
Kavarna (134000 kW, 15 turbines) Generalities
Wind farm name : Kavarna Country : Bulgaria
Total installed power : 134 MW
Yearly estimated production : 335 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1000 kW Operational
Operator : Arko Import
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : VTK
Part #3 :
5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 10000 kW Operational Operator : Longman
Part #4 :
Turbine(s) (manufacturer name not available) (turbine model not available) Total power : 112000 kW Operational
Part #5 :
Installation : 2009
6 turbine(s) Leitwind LTW77-1500 (puissance de 1500 kW, diamètre de 76.8 m) Hub height : 80 m Total power : 9000 kW Total wings surface : 27792 m² Operational
Part #6 :
Installation : 2009
1 turbine(s) Leitwind LTW80-1500 (puissance de 1500 kW, diamètre de 80.3 m) Hub height : 80 m Total power : 1500 kW Total wings surface : 5064 m² Operational
Kavarna E (4950 kW, 7 turbines) Generalities
Wind farm name : Kavarna E Country : Bulgaria
Total installed power : 4.95 MW
Yearly estimated production : 12 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational
Operator : VEC Engineering
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 600 kW Operational
Operator : Vertikal Petrov & Co
Part #3 :
5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 3850 kW Operational Operator : Windex
Kavarna N (5000 kW, 6 turbines) Generalities
Wind farm name : Kavarna N Country : Bulgaria
Total installed power : 5 MW
Yearly estimated production : 12 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational
Operator : Nik Builing Prim
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : City-D
Part #3 :
4 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 4000 kW Operational
Operator : Eco Energy BG
Kavarna NE (8500 kW, 13 turbines) Generalities
Wind farm name : Kavarna NE Country : Bulgaria
Total installed power : 8.5 MW
Yearly estimated production : 21 GW.h (for an equivalent of 2500 hours of full load / year)
Details Part #1 :
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1700 kW Operational
Operator : Evklips - Nikolay Rashev
Part #2 :
7 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 5100 kW Operational Operator : Disib
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational
Operator : Millenium Group holding
Part #4 :
2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 950 kW Operational Operator : Degrets
Kavarna NW (156000 kW, 52 turbines) Generalities
Wind farm name : Kavarna NE Country : Bulgaria
Total installed power : 8.5 MW
Yearly estimated production : 21 GW.h (for an equivalent of 2500 hours of full load / year)
Details Part #1 :
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1700 kW Operational
Operator : Evklips - Nikolay Rashev
Part #2 :
7 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 5100 kW Operational Operator : Disib
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational
Operator : Millenium Group holding
Part #4 :
2 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 950 kW Operational Operator : Degrets
Kavarna W (14100 kW, 17 turbines) Generalities
Wind farm name : Kavarna W Country : Bulgaria
Total installed power : 14.1 MW
Yearly estimated production : 35 GW.h (for an equivalent of 2500 hours of full load / year)
Details Part #1 :
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2700 kW Operational Operator : Argos
Part #2 :
14 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 11400 kW Operational Operator : Sinik
Mogilishte (3000 kW, 3 turbines) Generalities
Wind farm name : Mogilishte Country : Bulgaria
Total installed power : 3 MW
Yearly estimated production : 7 GW.h (for an equivalent of 2500 hours of full load / year)
Details
City : Mogilishte
3 turbine(s) Leitwind LTW77-1000 (puissance de 1000 kW, diamètre de 77 m) Total power : 3000 kW Total wings surface : 13971 m² Operational
Omurtag (750 kW, 1 turbine) Generalities
Wind farm name : Omurtag Country : Bulgaria
Total installed power : 0.75 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational Operator : City-D
Ruse Sth (95 kW, 1 turbine) Generalities
Wind farm name : Ruse Sth Country : Bulgaria
Total installed power : 0.095 MW
Yearly estimated production : 0 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 95 kW Operational Operator : Kapoli-ER
Shabla NW (1990 kW, 2 turbines) Generalities
Wind farm name : Shabla NW Country : Bulgaria
Total installed power : 1.99 MW
Yearly estimated production : 4 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 490 kW Operational Operator : Ecoenergy
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1500 kW Operational Operator : Windsys
Shabla SE (400 kW, 1 turbine) Generalities
Wind farm name : Shabla SE Country : Bulgaria
Total installed power : 0.4 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational Operator : KNPK
Shabla SW (6100 kW, 11 turbines) Generalities
Wind farm name : Shabla SW Country : Bulgaria
Total installed power : 6.1 MW
Yearly estimated production : 15 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2500 kW Operational
Operator : Wind Energie Varna
Part #2 :
5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 2400 kW Operational
Operator : Energy Invest
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1200 kW Operational
Operator : Dynamic group
Shabla West (1200 kW, 3 turbines) Generalities
Wind farm name : Shabla West Country : Bulgaria
Total installed power : 1.2 MW
Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)
Details
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1200 kW Operational Operator : Whirlwind
Sliven (1000 kW, 4 turbines) Generalities
Wind farm name : Sliven Country : Bulgaria
Total installed power : 1 MW
Yearly estimated production : 2 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 250 kW Operational
Operator : Energia Kavrakovi
Part #2 :
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational
Operator : ATM Bulgaria Ltd
Sliven E (1400 kW, 3 turbines) Generalities
Wind farm name : Sliven E Country : Bulgaria
Total installed power : 1.4 MW
Yearly estimated production : 3 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational Operator : Windcom
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational
Operator : East-European energy systems
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational
Operator : Photocommerce
Sliven N (6850 kW, 8 turbines) Generalities
Wind farm name : Sliven N Country : Bulgaria
Total installed power : 6.85 MW
Yearly estimated production : 17 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Part #1 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1200 kW Operational Operator : Nachev
Part #2 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1000 kW Operational
Operator : Rubikon Shipping
Part #3 :
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 1000 kW Operational
Operator : Nachevi & Co
Part #4 :
5 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 3650 kW Operational Operator : Yoana
Straldza Sth (750 kW, 3 turbines) Generalities
Wind farm name : Straldza Sth Country : Bulgaria
Total installed power : 0.75 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
3 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 750 kW Operational
Targoviste (500 kW, 1 turbine) Generalities
Wind farm name : Targoviste Country : Bulgaria
Total installed power : 0.5 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 500 kW Operational
Operator : Vertikal Petrov & Co
Verbund (16000 kW) Generalities
Wind farm name : Verbund Country : Bulgaria
Total installed power : 16 MW
Yearly estimated production : 40 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Turbine(s) (manufacturer name not available) (turbine model not available) Total power : 16000 kW Operational
Vetrocom (50000 kW) Generalities
Wind farm name : Vetrocom Country : Bulgaria
Total installed power : 50 MW
Yearly estimated production : 125 GW.h (for an equivalent of 2500 hours of full load / year)
Details
Turbine(s) (manufacturer name not available) (turbine model not available) Total power : 50000 kW Operational
Yambol (400 kW, 1 turbine) Generalities
Wind farm name : Yambol Country : Bulgaria
Total installed power : 0.4 MW
Yearly estimated production : 1 GW.h (for an equivalent of 2500 hours of full load / year)
Details
1 turbine(s) (manufacturer name not available) (turbine model not available) Total power : 400 kW Operational Operator : Popov
因篇幅问题不能全部显示,请点此查看更多更全内容