酒店名称:_____________________________________________ Address:
地址:_____________________________________________
_____________________________________________
Tel : Fax : Email:
电话: 传真:__________ 电子邮件:______________ General Manager:
总经理 ___________________________________________________ PROPERTY INFORMATION CHECKLIST 酒店开业文件清单目录
Date Hotel to be Opened:
酒店开业日期:….......................... ….......................... …......................... .......3 Finance & Business support:
财务及业务支持:….......................... ….......................... …........................ .....4 Risk mangaemet:
风险管理........................ ….......................... …........................ ..... ............ ......5 Brand standards & hallmarks
品牌标准及特点:...................... ….......................... …........................ ..... ...... 6 Legal:
法律:….......................... ….......................... …........................ ..... .............. ...7 Operations:
运营:….......................... ….......................... …........................ ..... .............. ...8 Announcement Sheet (Appendix I)
通告单(附件一):….......................... …................... ........................... .........9 Property Facility Summary Attached (Appendix II)
附酒店设施一览表(附件二):….......................... ….......................... ….......10 Risk Management Pre-Opening Checklist Attached (Appendix III)
附开业前风险管理检查表(附件三):….......................... ….......................... 12 Contractor Certification Attached (Appendix IV)
附总承包单位证明书(附件四)….......................... ….......................... …........13 Architect Certification Attached (Appendix V)
第 1 页 共 14 页
附建筑师资格证明(附件五)….......................... ….......................... …............15 Fire Safety System Certification Form I (Installation) Attached (Appendix VI) 附消防安全系统安装证明(附件六)….......................... ….......................... ... 17 Fire Safety System Certification Form II (Testing) Attached(AppendixVII)
附消防安全系统检测证明(附件七)….......................... ….......................... ... 19 Pre-Opening Inspection Report Attached (Appendix VIII)
附开业前检测报告(附件八)….......................... ….......................... ….......... .21 Confirmation of Executed Agreement Attached (Appendix IX)
附协议签署确认表(附件九)….......................... ….......................... …........... .22 Insurance Policy Attached (Appendix X)
附保险条款单(附件十)….......................... ….......................... ….....................24
Date Hotel to be Opened:
酒店开业日期_____________________________________________________________ PROPERTY酒店
Pre Opening Inspection Conducted. Project Approved for Opening (subject to conditions noted on Pre Opening Inspection Report)
已实施开业前检查。批准此项目开业( 须达到开业前检查报告所提出的条件 ) :
___________________________
Director – Design 总监 - 设计
_____________________________
(Date) 日期 :
_____________________________ Director – Engineering
总监 - 工程
_____________________________
(Date) 日期
Finance & Business Support 财务及业务支持 Insurance Policy Received & Approved
保险条款单已收到并获批准
Working Capital in place
营运资金已到位
Hotel Business License obtained
酒店经营执照已获取
_____________________________
第 2 页 共 14 页
Deputy General Manager – Finance
& Business Support 副总经理 – 财务及业务支持
_____________________________
(Date) 日期
RISK MANAGEMENT 风险管理
Risk Management pre-opening / operational procedures checklist: 开业前风险管理检查表
_____________________________
General Manager 总经理
_____________________________
(Date) 日期
BRAND STANDARDS & HALLMARKS 品牌标准及特点 Brand Hallmarks in place 提供并具备“品牌特色“ Brand standards compliance
(certify that brand standards have been complied and adhered to)
符合并达到“品牌标准” Please tick one 请选择: Golden Stone Star brands 金石之星酒店品牌
Golden Stone Business brands 金石商务品牌
Golden Stone International brands or other brands
第 3 页 共 14 页
金石国际或其他品牌酒店
_____________________________
职位
____________________________
(Date) 日期
LEGAL法律
Consulting service /Management Contract
顾问咨询/委托管理合同
Global Reservation System Licence Agreement Executed
酒店预订系统许可协议已签署
Trademark User Agreement Executed
注册商标用户协议已签署
Manager’s Operation Licence Issued
管理人的营业执照已签发
____________________________
Associate General Counsel
法律顾问
_____________________________
(Date) 日期
OPERATIONS运营 Authorisation to open
核准开业
________________________
General Manager
__________________________
(Date) 日期
第 4 页 共 14 页
Position:
总经理
Appendix I 附件一
Announcement
开业通告
行政办公室隆重宣布酒店集团旗下新开一家酒店。 This communication is for internal notification only and serves to alert you to activate your CHECKLIST for the support of this hotel. 此信函是内部通告和提请注意启动核实开业所需的文件。 NAME: 名称 ADDRESS: 地址
TEL / FAX: 电话/传真
Address all correspondence/materials to: 信件/材料邮寄地址 BRAND TYPE: 品牌
DESCRIPTION: 描述
EXPECTED OPENING DATE: 预期开业日期
Appendix II 附件二
Property facility summary 酒店设施一览 Name of Hotel 酒店名称 General Description (new build/conversion, stage at which IHG became involved) 总体描述(新建/改装, 酒店管理公司参与此项目的阶段) No. of keys 客房数 Std. room module size 第 5 页 共 14 页
标准客房面积 Std. room sleep area 标准客房卧室面积 Bathroom size/fixtures 浴室面积/设施 F&B Outlets (name, seating capacity, description) 酒店餐厅(名称、座位数量、描述) Meeting & Function Rooms (area, incl. Pre-Function space) 会议及多功能厅(面积,包括会议休息区域) Swimming pool (size, 如果有的话 depth) 游泳池(面积、深度) Health Club/Spa (size & 如果有的话 description of facilities/equipment) 健康俱乐部/水疗(面积、设施/设备详述) Other facilities 其他设施 Architect 建筑师 Interior Designer 室内设计师 Main Contractor 总承包单位 M&E Engineer 机电设计工程师 Fire Systems consultant 消防系统顾问 Kitchen/Laundry consultant 厨房/洗衣房顾问 Project cost & cost per room, excl. land 项目成本和每间客房成本,不包括土地成本 Reviewed by 第 6 页 共 14 页
检查人 Date 日期 ppendix III 附件三
Risk Management Pre-Opening / Operational procedures Checklist 酒店开业前风险管理检查表 Regulatory Certification & Approvals Yes 法定证件及许可 是 No N/A 否 不适用 Comments 备注 By:
General
Manager
总经
理
1 Food Hygiene Permit 食品卫生许可证 2 Liquor License 酒类许可证 3 Environment Protection Approval Permit 环境保护许可证 4 Pressured Vessels Registration (e.g. boilers) 压力容器登记证 (如:锅炉) 5 Lift Registration 电梯登记证 6 Drivers’ Licences 司机驾驶证 Yes 是 Comments 备注 Systems & Processes 系统及程序 No N/A 否 不适用 1 Hotel Incident & Crisis Manual 酒店事故及危机指南 2 Loss & Prevention Reporting Procedures 损失及预防报告程序 3 Emergency Response Training Guide 紧急应变培训指南 4 Fire Response & Emergency Evacuation Training / Drill 消防应变和紧急撤离培训 第 7 页 共 14 页
Appendix IV 附件四
酒店管理有限公司 CONTRACTOR’S CERTIFICATE 总承包单位证明书
Certificate of LOCAL AUTHORITY AND HOTEL MANAGEMENT COMPANY CODES AND STANDARDS COMPLIANCE
通过当地认可和达到酒店管理公司标准的证明
Hotel Name and Location:________________________________________________
酒店名称和所在地
I certify that this building has been built in compliance with the plans and specifications prepared by the various design consultants’ offices and reviewed by Shaanxi Regional Electric Hotel Management Co; and is in compliance with all applicable codes and standards, subject to the attached list of qualifications (if any).
兹证明该建筑之建造达到各项设计标准,并已由酒店管理公司检查,达到了所有相关的标准。附清单(若有)所列各项合格证书。
_______________________________________ Printed Name of Certifying Person
_______________________________________ Signature of Certifying Person
_______________________________________ Title of Certifying Person
证明人职务
证明人的打印名字
证明人签字
_______________________________________
Certifying Company/Authority Name/Company Seal
证明公司/正式名称/ 公章
_______________________________________ Date
日期
Note:
_______________________________________
List of qualifications attached (state Yes or No)
附:清单(注明是或不是) This form must be endorsed by the Contractor. 该文件必须由总承包单位签字 第 8 页 共 14 页
Appendix V 附件五
( )区域酒店 ARCHITECT’S CERTIFICATE
建筑设计师证明
Certificate of LOCAL AUTHORITY AND HOTEL MANAGEMENT COMPANY CODES AND STANDARDS COMPLIANCE
通过当地认可和达到酒店管理公司标准的证书
Hotel Name and Location : ____________________________________________________
酒店名称和所在地
I certify that this building has been designed in compliance with the plans and specifications prepared and coordinated by this office and reviewed by Shaanxi Regional Electric Power Hotel Management Co group, and is in compliance with all applicable codes and standards, subject to the attached list of qualifications (if any).
兹证明该建筑设计之各项细节均达到计划要求,并已由陕西省地方电力酒店管理有限公司检查,达到了所有相关的标准。附清单(若有)所列各项合格证书。
_______________________________________ Printed Name of Certifying Person
证明人的打印姓名
_______________________________________ Signature of Certifying Person
证明人的签字
_______________________________________ Title of Certifying Person
证明人的职务
_______________________________________
Certifying Company/Authority Name/Company Seal
证明公司/正式名称 / 公章
_______________________________________ Date
日期
Note: ______________________________________
List of qualifications attached (state Yes or No) 附:清单(注明是或不是) This form must be endorsed by Architect. 该文件须由建筑设计师签字。 第 9 页 共 14 页
Appendix VI附件六
( )区域酒店 FIRE SAFETY SYSTEM CERTIFICATE 消防安全系统证明
Hotel Name and Location :________________________________________________________ 酒店名称和所在地
Certificate of INSTALLATION for the Hotel
酒店消防安全系统安装证明
I certify that I have reviewed the requirements of the Fire Safety Systems described in the Shaanxi Regional Electric Power Hotel Management Co; Standards Manual, and the above-mentioned Hotel has an installed system which meets or exceeds these standards.
兹证实已查阅酒店管理公司标准手册中消防系统的要求,以上提及酒店安装的消防系统符合甚至超过此标准。
In addition, the entire fire safety system has been tested and is fully operational of this date. 此外,全部消防系统已被检测并且在此期间全面运转。 Printed Name of Certifying Person : 证明人打印姓名
Singature of Certifying Person : 证明人签字
Title of Certifying Person : 证明人职务
Certifying Company/Authority Name/Company Seal : 证明公司/正式名称/公章 Date : 日期
Approval by hotel management company Fire Safety Consultant – Hotel meets hotel management Co; requirements (attached schedule if necessary)
酒店管理公司消防安全顾问批准-酒店达到酒店管理公司要求(如有必要附进度表) Name of Company 公司名称
Signature of Certifying Person 证明人签字
Note: : : This form must be endorsed by the authorized fire service contractor/consultant or the local authority. The signature of the Owner, General Manager or Chief Engineer is not valid. 文件必须由经认可的消防安装合同单位或当地消防权威部门签字。业主、总经理和总工程师的签字均为无效。 第 10 页 共 14 页
Appendix VII附件七
酒店管理有限公司 FIRE SAFETY SYSTEM CERTIFICATE 消防系统证明
Certificate of TESTING for the Hotel
酒店消防系统检测证明
Hotel Name and Location
酒店名称和所在地:________________________________________________________
I certify that I have reviewed the requirements of the Fire Safety Systems described in the [] Standards Manual, and the above-mentioned Hotel has an installed system which meets or exceeds these standards. 兹证实已查阅[]酒店标准手册中消防系统的要求,以上提及酒店的安装系统符合甚至超过此标准。 In addition, the entire fire safety system has been tested and is fully operational of this date.
此外,全部消防系统已检测并且在此期间全面运转。
____________________________
Printed Name of Certifying Person
证明人的打印姓名
_________________________________
Signature of Certifying Person 证明人的签字
_________________________________
Title of Certifying Person 证明人职务
_________________________________
Certifying Company/Authority Name/Company Seal 证明公司/正式名称 / 公章
_________________________________ Printed name of Hotel General Manager 酒店总经理的打印姓名
_________________________________
Signature of Hotel General Manager 酒店总经理的签字
_________________________________
Date 日期 Note: This form must be endorsed by the Fire Testing Company. 该文件必须由消防测试单位签字 Note: 注意 • The hotel is obliged to update the \"Certification of Testing for the Hotel\" Form and undertake a full system test every 6 months. 酒店被要求每六个月保证对系统进行全面检测并更新酒店检测证书。 The first test must be carried out by an authorized contractor/consultant or the local 第 11 页 共 14 页 • authority before the 'official' opening date of the property. 酒店在开业前的首次检测必须由经认可的合同单位/顾问或当地权威机构执行。 • The second test, (after a further 6 months) may be carried out by the hotel Engineering or Security personnel. It is however strongly recommended that the services of an authorized consultant/contract or are engaged under a 'term contract' to undertake these tests, maintain the system and ensure full compliance. 六个月后的第二次检测可由酒店工程部或安全部执行,但强力推荐聘用有资质的专家提供检测服务,维护系统并确保正常运行。 • From this point every alternate testing, (or each 12 months) the test should be carried out and the form should be completed by the authorized independent fire services contractor/consultant or by the local authority and countersigned on the bottom 2 lines by the General Manager. 基于此点,隔次检测(或每12个月),应由经认可的合同单位,顾问或当地权威机构执行,总经理在倒数第2行签字。 第 12 页 共 14 页
Appendix VIII附件八
Pre-Opening Hotel Inspection Report 开业前检查报告 Please enclose copies of your Pre-Opening Hotel Inspection Reports. 请附上开业前酒店检查报告 1、 2、 3、 4、 5、 6、 7、 8、 9、 10、第 13 页 共 14 页
Appendix IX附件九
Confirmation of executed agreement 酒店管理有限公司酒店协议签署确认 This is to confirm that the following agreements for [hotel name] ______________________ have been executed:
兹确认[酒店名称]以下协议已签署。
1. Management Contract / Franchised Agreement_ ________________________
管理合同/特许经营协议 Date Executed
签署日期
2. Global Reservation System Licence Agreement _________________________
全球酒店预订系统许可协议 Date Executed 签署日期
3. Trademark User Agreement ______________________________________
注册商标用户协议 Date Executed
签署日期
By:
Printed Name of Certifying Person
证明人的打印姓名
Signature of Certifying Person
证明人的签字
Associate General Counsel,
Hotel Management Co;
法律顾问 Date 日期
Note:
This form must be filled by Legal Department. 该文件必须由法律部门签字。 Appendix X附件十 Insurance Policy 酒店管理有限公司酒店保险条款 COVERAGE (Please enclose copies of the insurace policies): 包含范围(请附上保险条款复印件) 1、 2、 3、 4、 5、 6、 7、 8、 9、 10、
第 14 页 共 14 页
因篇幅问题不能全部显示,请点此查看更多更全内容