QUALITY ASSURANCE PLAN
Project or System Name
U.S. Department of Housing and Urban Development Month, Year Revision Sheet Revision Sheet
Release No. Date Revision Description
Rev. 0 5/30/00 Quality Assurance Plan Template and Checklist Rev. 1 6/13/00 New section 2.0 (Task and Responsibilities) and additional text in section 3.1 Rev. 2 4/12/02 Conversion to WORD 2000 format
Quality Assurance Plan Page i Quality Assurance Plan Authorization Memorandum
I have carefully assessed the Quality Assurance Plan for the (System Name). This document has been
completed in accordance with the requirements of the HUD System Development Methodology.
MANAGEMENT CERTIFICATION - Please check the appropriate statement. ______ The document is accepted.
______ The document is accepted pending the changes noted. ______ The document is not accepted.
We fully accept the changes as needed improvements and authorize initiation of work to proceed. Based on our authority and judgment, the continued operation of this system is authorized.
_______________________________ _____________________ NAME DATE Project Leader
_______________________________ _____________________ NAME DATE
Operations Division Director
_______________________________ _____________________ NAME DATE
Program Area/Sponsor Representative
_______________________________ _____________________ NAME DATE
Program Area/Sponsor Director Quality Assurance Plan Page ii QUALITY ASSURANCE PLAN TABLE OF CONTENTS Page # 1.0 GENERAL
INFORMATION ...................................................................................................... 1-1
1.1
Purpose.............................................................................................................................. 1-1
1.2
Scope ................................................................................................................................. 1-1
1.3 System
Overview ............................................................................................................... 1-1
1.4 Project
References .............................................................................................................. 1-2
1.5 Acronyms and
Abbreviations .............................................................................................. 1-2
1.6 Points of
Contact ............................................................................................................... 1-2
1.6.1
Information ....................................................................................................................... 1-2
1.6.2
Coordination ..................................................................................................................... 1-2 2.0
SCHEDULE OF TASKS AND
RESPONSIBILITIES ................................................................ 2-1
3.0 SYSTEM
DOCUMENTATION ................................................................................................. 3-1
3.1 Documents by
Phase .......................................................................................................... 3-1
3.1.1 Initiate
Phase .................................................................................................................... 3-1
3.1.2 Define
Phase ..................................................................................................................... 3-1
3.1.3 Design
Phase .................................................................................................................... 3-2
3.1.4 Build
Phase ....................................................................................................................... 3-2
3.1.5 Evaluate
Phase .................................................................................................................. 3-2
3.1.6 Operate
Phase ................................................................................................................... 3-2
3.2 Discipline for Documentation Standard
Practices ................................................................ 3-3
4.0 REVIEWS AND
AUDITS .......................................................................................................... 4-1
4.1 Review
Process .................................................................................................................. 4-1
4.2 Formal Reviews and
Audits ................................................................................................ 4-1
4.2.1 Lifecycle
Reviews.............................................................................................................. 4-1
4.2.2
Audits ............................................................................................................................... 4-1
4.3 Informal
Reviews ............................................................................................................... 4-2
4.4 Review
Reports .................................................................................................................. 4-2
4.5 Review and Audit
Metrics .................................................................................................. 4-2 5.0
TESTING ................................................................................................................................... 5-1 6.0 PROBLEM REPORTING AND CORRECTIVE
ACTION ......................................................... 6-1
6.1 Problem/Issue
Documentation ............................................................................................ 6-1
6.2 Report
Metrics ................................................................................................................... 6-1 7.0
TOOLS ....................................................................................................................................... 7-1 8.0 PROJECT
CONTROLS ............................................................................................................. 8-1
8.1 Product
Control ................................................................................................................. 8-1
8.2 Supplier
Control ................................................................................................................ 8-1 9.0
TRAINING ................................................................................................................................. 9-1 Quality Assurance Plan Page iii
1.0 General Information 1.0 GENERAL INFORMATION Quality Assurance Plan 1.0 General Information
NOTE TO AUTHOR: Highlighted, italicized text throughout this template is provided solely as
background information to assist you in creating this document. Please delete all such text, as well as
the instructions in each section, prior to submitting this document. ONLY YOUR PROJECT-
SPECIFIC INFORMATION SHOULD APPEAR IN THE FINAL VERSION OF THIS DOCUMENT.
This Quality Assurance Plan (QAP) presents a framework for activities, which when followed, will ensure
delivery of quality products and services. The SDM provides the project standards and procedures to be
used as the basis for the QA group's reviews and audits. 1.0 GENERAL INFORMATION
1.1 Purpose
Describe the purpose of the Quality Assurance Plan. 1.2 Scope
Describe the scope of the Quality Assurance Plan as it relates to the project.
1.3 System Overview
Provide a brief system overview description as a point of reference for the remainder of the document. In
addition, include the following: , Responsible organization , System name or title , System code , System category
, Major application: performs clearly defined functions for which there is a readily
identifiable security consideration and need
, General support system: provides general ADP or network support for a variety of users
and applications , Operational status , Operational , Under development
, System environment and special conditions Quality Assurance Plan Page 1-1
1.0 General Information 1.4 Project References
Provide a list of the references that were used in preparation of this document. Examples of references
are:
, Previously developed documents relating to the project , Documentation concerning related projects , HUD standard procedures documents , Quality Assurance Guidelines
1.5 Acronyms and Abbreviations
Provide a list of the acronyms and abbreviations used in this document and the meaning of each.
1.6 Points of Contact 1.6.1 Information
Provide a list of the points of organizational contact (POCs) that may be needed by the document user for
informational and troubleshooting purposes. Include type of contact, contact name, department, telephone
number, and e-mail address (if applicable). Points of contact may include, but are not limited to, helpdesk
POC, development/maintenance POC, and operations POC. 1.6.2 Coordination
Provide a list of organizations that require coordination between the project and its specific support
function (e.g., installation coordination, security, etc.). Include a schedule for coordination activities.
Quality Assurance Plan Page 1-2
2.0 Schedule of Tasks and Responsibilities 2.0 SCHEDULE OF TASKS AND RESPONSIBILITIES Quality Assurance Plan
2.0 Schedule of Tasks and Responsibilities 2.0 SCHEDULE OF TASKS AND RESPONSIBILITIES
Based on the tasks described in your Project Plan, provide a
schedule of the QA activities for the duration of the project. Tasks may include, but are not limited to, those listed below. (Refer to the Quality Assurance Guidelines in the SDM for a complete description of these tasks.) A waiver exempting the
project from any of these tasks is required. , Identify Standards and Guidelines , Evaluate Software Tools , Evaluate Facilities
, Evaluate Software Products Review Process , Evaluate Project Planning, Tracking, and Oversight Processes , Evaluate Requirements Analysis Process , Evaluate Design Process
, Evaluate Code and Unit Testing Process , Evaluate Integration Testing Process , Evaluate Acceptance Testing Process , Evaluate Release Process
, Evaluate the Corrective Action Process , Evaluate Media Certification Process , Certify Non-deliverable Software
, Evaluate Storage and Handling Process , Evaluate Deviations and Waivers Process , Evaluate Configuration Management Process , Evaluate Software Development Library Control Process , Evaluate Non-developmental Software , Perform Configuration Audits
, Evaluate Risk Management Process Quality Assurance Plan Page 2-1 3.0 System Documentation 3.0 SYSTEM DOCUMENTATION Quality Assurance Plan 3.0 System Documentation 3.0 SYSTEM DOCUMENTATION
This section describes all documentation that will be generated, by lifecycle phase, for the project. The identified documentation listed will be that which control the development, verification and validation, use and maintenance of the software.
3.1 Documents by Phase
List and briefly describe the documentation expected to be produced during this project. Depending on the size of your project, this may include, but is not limited to, the documents in the following subsections. (Note that some of the documents listed below are updated in subsequent phases.) The HUD SDM Documentation Standards lists the objectives for producing standardized system documentation. The QAP may
include any other deliverables cited in the project Work Breakdown Structure (WBS). 3.1.1 Initiate Phase
, Needs Statement
, Project Plan (including WBS) , Configuration Management Plan , Quality Assurance Plan , Feasibility Study
, Cost/Benefit Analysis , Risk Analysis 3.1.2 Define Phase
, System Support and Acquisition Plan (initial) , Functional
Requirements Document , Data Requirements Document , System Security and Privacy Plan , Internal Audit Plan
, Project Plan (updated) Quality Assurance Plan Page 3-1 3.0 System Documentation 3.1.3 Design Phase
, System/Subsystem Specifications , Database Specifications , Program Specifications , System Support and Acquisition Plan (final) , Validation, Verification, and Testing Plan (initial) , Training Plan (initial) , Project Plan (updated) 3.1.4 Build Phase
, Installation and Conversion Plan (initial) , Test Plan , User’s Manual , Operations Manual , Maintenance Manual
, Validation, Verification, and Testing Plan (final) , Training Plan (final)
, Project Plan (updated) 3.1.5 Evaluate Phase
, Test Results and Evaluation Reports , Installation and Conversion Plan (final) , Project Plan (updated) 3.1.6 Operate Phase
, Pilot Test Results , Training Material , Project Plan (updated) Quality Assurance Plan Page 3-2 3.0 System Documentation
3.2 Discipline for Documentation Standard Practices Describe the criteria that will be applied during review and evaluation of all lifecycle documents. If HUD
documentation standard templates are not used in the creation of project documents, describe the
alternative. A waiver exempting the project from standard template usage is required.
Quality Assurance Plan Page 3-3 4.0 Reviews and Audits 4.0 REVIEWS AND AUDITS Quality Assurance Plan 4.0 Reviews and Audits 4.0 REVIEWS AND AUDITS
This section discusses quality assurance’s role in the reviews and audits that will be conducted during
the lifecycle of the project to ensure the quality, consistency, comprehension, and completeness of the
project documentation and activities. 4.1 Review Process
Define the steps of the review process and the procedures that will be used to conduct reviews. Address
management and attendee responsibilities with respect to the review process.
4.2 Formal Reviews and Audits
This subsection addresses the formal, scheduled reviews and audits that will be conducted on the project.
Reviews are a monitoring mechanism to assess the progress and well being of the project.
4.2.1 Lifecycle Reviews
Identify the types of SDM associated lifecycle or non-lifecycle reviews that will be conducted within each
project lifecycle phase. Include a schedule of reviews and include how the results of each review will be
used on the project. Typically, the lifecycle reviews include: , Requirements Review
, Preliminary Design Review , Specification Review , Design Review
, Critical Design Review , Test Readiness Review , Formal Qualification Review , Production Readiness Review , Acceptance Test Review , Post-Implementation Review 4.2.2 Audits
Describe the audits that will be conducted on the project and when they will be scheduled. Audits are
independent examinations of a deliverable or a set of deliverables. Audits are accomplished by
comparing the actual characteristics of a deliverable with those required or specified.
Quality Assurance Plan Page 4-1 4.0 Reviews and Audits 4.3 Informal Reviews
Outline the types of informal reviews that will be conducted. Types of reviews may include walkthroughs, desk check codes, peer reviews, and quality control reviews. 4.4 Review Reports
Identify QA reports that will be produced throughout the project lifecycle and their uses. These reports
may include:
, Review issues list , Review summary report , Action tracking report 4.5 Review and Audit Metrics
Describe the metrics that will be used to capture management information, and how they will be analyzed
and reported.
Quality Assurance Plan Page 4-2 5.0 Testing
5.0 TESTING
Quality Assurance Plan 5.0 Testing 5.0 TESTING
Identify the roles and responsibilities of the QA function in relation to testing throughout the various stages
of the project. These include but are not limited to: , Unit testing , System testing , Integration testing , Regression testing , Acceptance testing
Quality Assurance Plan Page 5-1
6.0 Problem Reporting and Corrective Action 6.0 PROBLEM REPORTING AND CORRECTIVE ACTION Quality Assurance Plan
6.0 Problem Reporting and Corrective Action 6.0 PROBLEM REPORTING AND CORRECTIVE ACTION
Discuss QA responsibilities and activities concerned with the reporting and tracking of project-related problems and resolutions.
6.1 Problem/Issue Documentation
Explain how problems and issues will be documented. 6.2 Report Metrics
Describe how metrics from the above reports will be collected and analyzed to determine and coordinate corrective actions.
Quality Assurance Plan Page 6-1 7.0 Tools 7.0 TOOLS
Quality Assurance Plan 7.0 Tools 7.0 TOOLS
This section discusses QA responsibilities and activities concerned with the reporting and tracking of
project related problems and resolutions.
Describe the tools that will be used for QA and the methodology employed to implement usage of the
mentioned tools. The tools may include, but are not limited to: , Operating system utilities , Debugging aids , Documentation tools
, Code and structure analyzers , Monitors
, Statistical analysis packages , Static or dynamic test tools Quality Assurance Plan Page 7-1 8.0 Project Controls 8.0 PROJECT CONTROLS Quality Assurance Plan 8.0 Project Controls 8.0 PROJECT CONTROLS
8.1 Product Control
Identify how QA will monitor the methods and tools used to maintain and store controlled versions of
system products. 8.2 Supplier Control
Describe the provisions for assuring that products provided by suppliers meets established requirements.
In some cases, projects do not foresee purchasing certain products. If that is the case, the following
paragraph may be used:
All supplier products have been operationally tested in the target system. No future product acquisition
is planned.
Quality Assurance Plan Page 8-1 9.0 Training 9.0 TRAINING
Quality Assurance Plan 9.0 Training 9.0 TRAINING
Identify the training activities that will be provided to meet the needs of QA on this project. Suggested training may include:
, Project orientation on roles, responsibilities, and quality assurance staff authority , Software engineering skills and practices
, Project standards, procedures, and methods
, Understanding and using automated tools , Interpersonal communications Quality Assurance Plan Page 9-1
欢迎您阅读该资料,希望该资料能给您的学习和生活带来帮助,如果您还了解更多的相关知识,也欢迎您分享出来,让我们大家能共同进步、共同成长。
欢迎使用“Quality Assurance Plan”使用,该文档doc格式,如大家有其它疑问或者新的见解,欢迎大家互相交流、互相进步。
因篇幅问题不能全部显示,请点此查看更多更全内容
Copyright © 2019- haog.cn 版权所有 赣ICP备2024042798号-2
违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com
本站由北京市万商天勤律师事务所王兴未律师提供法律服务