您好,欢迎来到好走旅游网。
搜索
您的当前位置:首页悬臂梁施工工艺流程

悬臂梁施工工艺流程

来源:好走旅游网
Construction Workmanship Flow Chart for Cantilever Beam

Making traveling corriages, assemble and survey Setting up support meat the Foundation and pier body construction Precasted reinforcement centering of 0#.1#.1’# beam Erecting permanent temporary bearing Grouting 0#. 1#. 1`# beam Leveling top surface of 0#. 1#. 1`# beam Precast 2#(2`#) beam bottom web reinforcement support Installing Hanged 2#. 2`# beam. Moving inner support, installing 2#.2`# beam and top plate steel Surrey elevation of observed pointbefor grouting concrete Symmetrily grouting concrete for 2#.2`#beam Survey elevation after grouting concrete Leveling top surface of 2#. 2`# beam Curing and protecting Survey elevation of observed point before extension Tensioning and grouting Survey elevey elevation after tensioning Adjust 3#. 3`# beam construction clevation of setting up forms Side span straight lint construction Hanged grouting 3#(3`#-n#(n`#) beam Removing traveling carriages

因篇幅问题不能全部显示,请点此查看更多更全内容

Copyright © 2019- haog.cn 版权所有

违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务